A countertop is templated after the cabinets are in and level, never before. A template taken off a drawing produces a top that does not fit, and stone is not adjustable once it is cut.
How countertops actually get fitted
The cabinets go in and get levelled. A templater comes and measures the real installed run, including the wall that is not quite straight. The top is cut to that template, then delivered and set.
That gap between installation and delivery is when you have no worktop and no sink. We tell you when it starts so you can set up somewhere else in the house first.
- Templated on site off installed cabinets
- Quartz, granite, solid surface and laminate
- Sink and faucet cutouts, drainage grooves and edge profile agreed before cutting
- Seams placed where they are least visible, agreed with you first
- Old tops removed and taken away
Choosing a material by how you cook
Quartz is consistent, needs no sealing and does not like a hot pan straight off the burner. Granite takes heat and varies slab to slab, so you should see the actual slab rather than a sample. Both outlast the kitchen around them.
Pick for how the room gets used. A household that bakes wants a different surface from one that mostly reheats.
See the slab
Stone is a natural material and no two slabs match. The piece in the yard is what ends up in your kitchen, so it is worth going to look at it before it is cut.
Related reading
How to Choose a Kitchen Countertop
Pick a countertop by how you cook, not by how the sample looks in a showroom. What matters is heat, water, and whether you want to
Read the articleRefacing or Replacing Kitchen Cabinets: How to Decide
Cabinet refacing vs replacing gets answered with price, and price is the wrong first question. What your boxes are made of decides
Read the articleKitchen Remodel Mistakes, and the Order That Prevents Most of Them
The common kitchen remodel mistakes are not about taste. They are about sequence: ordering before the design is final, and booking
Read the articleWe run the project, not just the install
The design is the part you see. The rest is scheduling trades, chasing deliveries and keeping the sequence right so the room comes back together on time. That coordination is the service you are paying for.
One point of contact
You call one number. We handle the trades, the suppliers and the schedule between them.
Deliveries timed to the work
Cabinets and counters arrive when the site is ready, not weeks early in your garage.
A sequence that holds
Every trade knows what comes before and after, so one delay does not cascade through the job.
Other services
Appliance Installation
Appliance dimensions decide cabinet openings, which is why appliances get chosen during the design and not at the end. A refrigera...
Read moreBasement Remodeling
A basement is the cheapest square footage you will ever add, provided it is dry. Everything else about the job depends on settling...
Read moreBathroom Remodeling
Bathrooms are small, which makes every decision louder. Shower width changes how the whole room feels, and moving a toilet is a bi...
Read moreCustom Cabinets & Cabinet Installation
Cabinets are most of what you see and most of what you spend. They are also the only part of a kitchen that cannot be changed afte...
Read moreDoor Installation
A door that sticks in August and rattles in January was almost certainly hung out of square. Interior or exterior, the frame and t...
Read moreFlooring Installation
Flooring goes in at a specific point in the sequence, and getting it wrong means either laying an expensive floor for the trades t...
Read moreServing 15 towns across two counties
Based at 15 Koehos Dr, Chester, NY 10918, working throughout Orange County NY and Bergen County NJ.